Case Study: Spanish Fork, UT

General Bore Information: Bore Date: 2/21/18 Bore Location: Spanish Fork, UT (45 mins south of SLC) Job Type: City fiber/communication lines Contractor: Spanish Fork Communication Networks Product: 2” line Machine: Vermeer 20×22 S3 Bit: 4” Paddle  Mud GPM: 10-15gpm Water Tank Size: 500 gallon Bore Length: ~100ft, 7-8ft depth Current Drilling Mud Mix: Water only PAF Product Mix: 2gal BoreShield, …

Case Study: Boise, ID

General Bore Information: Bore Date: 2/27/18 Bore Location: Boise, ID (downtown) Job Type: Utility lines Contractor: Sawtooth Drilling Product: 6” Machine: Vermeer D36x50 Series 2 Bit: 4” single roller  Mud GPM: 3gpm Water Tank Size: 1000 gallon (only filled halfway to use minimal product) – covered/heated Bore Length: ~100ft, 10-12ft depth Current Drilling Mud Mix: Bentonite + poly additives PAF …

Case Study: Riverside, CA

Job Details Location: Riverside, CA Customer: California Boring Distributor: RDO/Vermeer Pacific – Riverside, CA Shake Out Test: 50% clay, 35% sand, 15% silt Tank Size: 1000 gal PAF Products Used: 4 gal BoreShield, 1 gal ProDrill, 0.5 gal ProDyne, 0.5 gal ClayLock Pilot Bore: 4” bit, ~130’ length, 2-3’ deep, 4-5 gpm *as you can tell from the pictures, this …

Case Study: Redlands, CA

Job details Location: Redlands, CA Customer: Cal Empire Engineering Distributor: RDO/Vermeer Pacific – Riverside, CA Shake Out Test*: 40% sand, 40% clay, 20% silt *Note: This soil sample was taken at about 5ft depth. Based on the returns, there was more than 50% sand at the 9ft level. Tank Size: 1000 gal PAF Products Used: 4 gal BoreShield, 1 gal …

Case Study: Meridian, ID

General Bore Information:  Bore Date: 2/28/18 Bore Location: Meridian, ID Job Type: Utilities Contractor: Das-co Utility Contractors Product: ¾” steel gas main Machine: Ditch Witch JT20 Bit: 4” paddle Mud GPM: 5-8 gpm Water Tank Size: 500 gallon Bore Length: 100 feet Bore Depth: 4 feet Soil Conditions: 70% clay, 20% sand, 10% silt Current Drilling Mud Mix: bentonite PAF …